|
|
| |
|
Home >
Services >
Non-Revenue Water >
Scope of Work |
 |
|
|
Zone Establishment
-
To prepare the network
drawings and identified
potential area to be
sectored.
-
To carryout the
establishment of NRW zones
such as:-
- Pressure & Flow
Survey
- Zero Pressure Test
- Identified meter
location
- Carryout N1 and N2
Step Test
-
Water Balance Analysis &
Determined Leakage level
-
Leak detection & Repair
-
Pipe & Communication
Replacement
-
Final Measurement NRW level
Mapping
-
Confirmation the accuracy of
the pipe route, location of
valves, underground hydrant
etc
-
Data Collection
-
Digitized base map in
mapping software
-
GPS Survey
-
Network Information System
Database
-
Confirmation on Information
from the base map such as
road, street, house lot
numbers, building, name and
etc
-
Site investigation &
verification
Monitoring & Maintenance
-
Monitoring Progress
-
Download Pressure & Flow
-
Plan routine zones
maintenance (Meter, PRV,
Logger etc)
-
Carry out analysis on
minimum night flow
-
Zones Pressure
-
Plan and prioritizing NRW
Intervention level
-
Repair on Zones with higher
leakage level
|
 |
|
 |
|
|
|